6L/12P OVEN #2 F/E TUBING (PARALLEL)

6L/12P Oven #2 Fill/Evac Tubing (2 pcs)
External 3/8″OD Electropolished Tubing w/ fittings to connect 2nd oven to cleaner in PARALLEL.
(ovens placed on either side of cleaner)

Related Products